We’re getting close to moving Wildling into the water so the mast and rigging can go on. A lot of work is being done now on the cockpit furniture, deck fittings and electronics.

Applying the boat name graphics

The hull mold joins are faired and finished, and the bottom paint is complete.

The lifelines on deck are now complete, and the bow seats have been installed.

Bow roller and chain for the main anchor is installed and the trampoline lacing is complete.

Outremer graphics installed

Boat name on the transom and a nice view of the teak steps.

Cockpit furniture being installed

Watermaker control panel at the top of the starboard steps

Starboard transom steps and engine room hatch.

Master cabin, port aft. You can see the small step we had installed at the bottom right of the photo. This makes it easier to climb in and out of the bed without stepping on the seat cushion each time.

Port companionway


Gavin’s cabin – starboard fwd.

Starboard companionway bathroom

Lindsay’s cabin – starboard aft.

Master bathroom.

Like this:
Like Loading...
Looking fantastic. The name looks wonderful. Love that teak! Mum
Beautiful! Can’t wait to see it in the flesh! Not long now! Dad
Sent from my iPad